IIEP of Typical Application Area & Data Center
Typical Application Area
- Industrial Parks,Universities,Commrecial Buildings
Major Challenging
- To achieve the project's investment financial objectives and energy conservation
- To & carbon reduction targets
- Ensuring financial targets are locked in through accurate simulation calculations
- Correctly select technical routes and equipment capacity
IIEP Solution
- Integrating renewable energy and leveraging multi-energy complementarity to maximize carbon emission reduction
- Comprehensive energy solutions considering multiple technical routes such as heat pumps, chillers, energy storage systems, and combined cooling, heating, and power (CCHP)
- Minimizing grid electricity costs and fuel expenses.

Typical Application Area
- Commercial Buildingg/Public area
Major Challenging
- Aim to reduce grid electricity costs through the use of renewable energy and battery energy storage
- Seek to maximize the return on investment (ROI) of the charging pile project
- Wish to understand alternative solutions for delaying grid upgrade and reconstruction investments
IIEP Solution
- Analyze the energy interaction among load, photovoltaic (PV), wind power, and the grid
- Charging station model based on charging behavior simulation and flexible regulation of battery energy storage
- Maximize charging pile revenue and save energy costs.

